Structural analysis of a jack-up drilling rig is carried out for the maximum loading in preload condition. ABS inspection reported some brackets are buckled. Therefore, the structure is analyzed for it is strength and recommended the way fwd.
Structural analysis of a jack-up drilling rig is carried out for the maximum loading in preload condition. ABS inspection reported some brackets are buckled. Therefore, the structure is analyzed for it is strength and recommended the way fwd.