Pre-Bid Engineering for Ratna MOPU has been carried out successfully for its client. A 4 Leg new build option as well as 3 leg MODU to MOPU conversion options were worked out. The following documentation were generated for the project.
- General Arrangement Drawings
- Scantling Drawings
- P & IDs
- Fire & Safety Plans
- Design Philosophies
- In-place & Fatigue Analyses
- Stability and Motion Analyses
- RFQs for Mechanical, Piping, Electrical and Instrumentation Equipment
- Bulk MTOs