Spudcan Structural Analysis
Structural analysis of a jack-up drilling rig is carried out for the maximum loading in
Structural analysis of a jack-up drilling rig is carried out for the maximum loading in
LNG Jetty Expansion FEED activities carried with below scope of work Mooring Analysis as per
Intact and Damage mooring analysis is been carried out for derrick lay barge for assessing
Foundation design for winch and iron roughneck for offshore drilling rig. Engineering Analysis and Foundation
Ark2Tech was part of the MFP project for Offshore, Turkmenistan. We have carried out the